Department

Construction Management

Additional Department

Civil and Environmental Engineering

Document Type

Article

Publication Date

5-11-2024

Embargo Period

10-23-2026

Abstract

Large-span, post-tensioned (PT) beams play a crucial role in maximizing the benefits of post-tensioning techniques. Bonded and unbonded systems are prevalent, with the latter being more widespread in the United States. While bonded systems are advantageous for creating long spans when multiple tendons are grouped in ducts, limited studies in the literature exist on their demolition. With a case study, this paper addresses the unique challenge of demolishing large-span-bonded, post-tensioned beams that occurs due to a building’s functional change. Emphasizing insights for engineers, it explores the use of cutting and dismantling methods, thereby considering the presence of prestressed cables. The demolition process is distinctive due to the presence of numerous prestressed cables along the beams, necessitating a specialized and cautious cutting approach. This is accomplished through the use of a drilling technique that selectively distresses the tendons, ensuring they are not all affected simultaneously. An intriguing observation discussed in this paper pertains to the occurrence of horizontal cracks accompanied by loud sounds following the drilling process, thereby offering insights from the design perspective of PT systems. This paper details an innovative method for safely demolishing large-span, bonded PT beams using ground-penetrating radar and computer models to navigate structural complexities and ensure nearby structures’ safety.

Journal Title

Buildings

Journal ISSN

2075-5309

Volume

14

Issue

5

First Page

1380

Digital Object Identifier (DOI)

10.3390/buildings14051380

Comments

Open access article distributed under the Creative Commons Attribution (CC BY 4.0) license, https://creativecommons.org/licenses/by/4.0/.

Share

COinS