CEVIT: A Useful Analysis to Address the Current EV Chargers on KSU Marietta Campus
Date of Submission
Spring 4-23-2023
Project Type
Senior Design
Major
Industrial and Systems Engineering
Department
Engineering
Committee Chair/First Advisor
Adeel Khalid
Abstract
Currently there is only one Electric Vehicle Charging Station at Kennesaw State University Marietta campus. With demand for Electric Vehicles only increasing year by year Implementing EV chargers will prepare KSU with future Electric Vehicle drivers, show that KSU is cutting back on its carbon footprint, and can potentially incite potential students to come to KSU. CEVIT aims to show the costs associated with Installing EV chargers, optimal locations to place EV chargers, and compares the different types of chargers KSU could install.
Paper
FDR powerpoint_completed.pptx (10786 kB)
Presentation
36x48-poster-CEVIT.pptx (861 kB)
Poster
Comments
Video link- https://youtu.be/wPryLqtd_Gk