Date of Submission
Spring 4-28-2025
Project Type
Senior Design
Major
Industrial and Systems Engineering
Degree Name
Bachelor of Science in Industrial and Systems Engineering
Department
Engineering
Committee Chair/First Advisor
Dr. Adeel Khalid
Abstract
Gwinnett County Department of Water Resources (GCDWR) manages approximately 200 construction projects simultaneously, incurring significant annual engineering support costs—$6.6 million in 2023 alone. GCDWR has engaged our team to determine whether current contractor spending yields sufficient value. Using one year of invoice data provided by GCDWR, our project aims to:
-
Evaluate and validate contractor invoices for consistency with original proposals
-
Establish data-driven benchmarks to assess and predict appropriate engineering costs based on project characteristics
-
Develop a system that streamlines invoice tracking and discrepancy detection
-
Reduce overall engineering support spending for future projects
Senior Design Video.mp4 (141785 kB)
Poster.pptx (774 kB)
Final Design Review (1).docx (4912 kB)